It does not seem like doing the concrete after would pose a big problem at all, but others may have something to add to that. I can't say I've seen the floor done first unless it was a steel or wood framed building erected on a slab on grade. I've spent many years in the industry on large jobs, and know the materials well, but these types of buildings are unique, good to hear from those who build em or anyone who has had one built. Once you have the post type building up, it's just a matter of forming out where you want the slab to terminate. You'll obviously want to beef up reinforcing around doorways etc. Isolate your posts with asphalt impregnated expansion joint material, and make sure everything you may want under or in the slab is in, elec, pipe, communications etc etc. You'll have plenty of time to do this and research a concrete design mix, reinforcing and a reputable subcontractor to do the work. When the pour takes place, it may be dark, so when finishing the fresh concrete, you may want to illuminate the work area, once the roof is on it will be dark unless you have elect svc. and lights, good to see what you are doing when finishing concrte.
|