|
If the workshop has a ventilated attic above the ceiling, I don't think you need any vapor barrier at all. Any diffused vapor will easily disperse completely through the insulation and into the open air above. At least in the USA a ceiling vapor barrier is not required by code in this circumstance. You should also consider that a workshop does not have large sources of moisture the way houses do, such as cooking, bathing, and laundry facilitites. Two coats of ordinary latex paint applied to plywood that has the joints taped and filled makes a 10 perm vapor barrier. For extra credit, you can get it down to 1 perm using a more specialized vapor barrier paint. If you insist that you have to use plastic, then you should staple it to the bottom of the bare joists, then attach the plywood. Draping it over the top of the studs is a bad idea, since that will tend to hold the insulation back from full contact with the plywood. Insulation is at its most effective when it is in continuous contact with the air barrier (the plywood in this case). Leaving an air gap between the plastic and the plywood allows for convective currents to compromise insulation, and provides the possibility of trapping water vapor between the plastic and the plywood.
|