Welcome Guest, Log in or Register
Author 
N. TX Tim

02-01-2006 20:43:49




Report to Moderator

I am adding on to my shop and will be pouring a 13' x 48' slab. Weight of the building will be supported by steel posts set into the ground...so, am planning about a 4" slab with footers about 12" deep. Acquired a bunch of rebar from a friend...3/8, 1/2, and a little 5/8.

Was wondering what size rebar would be best to use and how far to space it out...was thinking the 3/8 would be fine at about 2' spacing.

Part of this addition will be used as a woodshop and tool storage area, so won't have any excessive load.

Also, am planning a 40'x40' shop next to this one for my tractor work etc. Will a 4" slab be ok here too, or should I do something different.

Thanks,
Tim

[Log in to Reply]   [No Email]
Billy NY

02-02-2006 08:21:56




Report to Moderator
 Re: O/T, Concrete slab in reply to N. TX Tim, 02-01-2006 20:43:49  
Just had to barge in, LOL always an interesting topic. I like hearing about other pours the best. I've preferred a tighter spacing on rebar, like 1'-0" x 1'-0" and it's overkill to an extent, more expensive but it comes from being in construction, where we use temp. structural pads, but sometimes beef up areas that will be finished, that have construction traffic before we are done, including running equipment over it. I don't get a lot of cracks, but when big pours are done, best to plan them out in sections, sometimes they sawcut to make inevitable cracks look neat. I've done structural slabs at building entranceways, that are finished like sidewalks, and loaded materials off them, sometimes before 28 days, heavily protected and the base well compacted. Sometimes you have to pour the sidewalk slabs out of sequence to get a certificate of occupancy on time, work may still be going on inside, but some floors are 100%, so you make it strong to hold up, it's just money well spent, you don't have to go back and re-do what the const. traffic broke up. When I find a good concrete contractor I try to use them for as much work as they can do, as it is hard to find and or trust someone based on talk. Means and methods vary, do as much research as you can with contractors, look at other work previously done by the contractor if possible, like the jobs described here and use it to your advantage. I can attest for good material, we used a specified lightweight concrete fill, 1000 P.S.I. as per contract spec.'s for an elevator machine room roof, decks, stairs, as per locations on drawings, I had to top it off, later, with a special topping material, the finish crumbled, I'll never allow 1000 p.s.i. lt.wt. conc. with a finish to be used on a job again, bad design, better to beef up the decking and supports if weight is a problem, that was the worst pour we ever did, had union guys after hours, crane after hours, a cash deal, and it went bad because of the material, not the suppliers fault, he mixed the material right from the spec's. The topping bonded nicely, finish was rough after it spalled, so we got the light weight where it was called for, and the topping made it look like it was supposed to. Trying to finish with bad material was the worst, it would not set up, after putting in a full day, the guys worked til midnight and were beat. Also using a hopper and a crane slowed the pour. A good learning experience, pour early in the morning and buy good material, I'll never do an afternoon pour again if at all possible.

More babble, have some downtime at the moment.

[Log in to Reply]  [No Email]
Dave NE IA

02-02-2006 08:19:28




Report to Moderator
 Re: O/T, Concrete slab in reply to N. TX Tim, 02-01-2006 20:43:49  
Up here in Iowa we have extreem temperature differances so you must weigh out this information.

We take note of anyone saying no cracks, because up here regardless who pours it there are cracks. Those who say no cracks need to take some dust and spread it on the floor and jar the floor, It many times will show the cracks that they have never seen before.

The real issue is to make it crack where we want it to crack (saw joints) and to hold the random unwanted cracks together so you can't see them---thus rebar---up here wire mesh with the 6 x 6 pattern no.10 wire is a feel good for the lower budget folks. A total waiste in my opinion.

I do totaly agree on the compaction issue raised preveously, however in our area a uniform fill is very important. It most always cracks where the fill meets the solid ground. We live in rough hillsides, and insist on digging out the hard fill so the building gets the same depth of fill overall. Very expensive but if they use the words (guarentee no cracks) it is a must. Compaction in uniform 4-6 inch lifts is also a must. You can drive your pickup over a sheet of thin plywood if the fill is uniform and solid under it.

Rebar in our area and my mind is money well spent-1/2 inch no grade is the most bang for the buck--again in our area.

If you have a drain dug across--guess what -- the trench can settle, thus a known place for a potentual crack, This may not related to you without frost, but expansion or control joints are a must.

You will have to know where your building site is, but if you have good drainage, we do NOT use a visqueen as we want the sand to suck up the moisture from the concrete floor. Precautions are needed to avoid this during the pour. If in a damp location you would of course want to stop it from drawing into the slab with visqueen.

When using rebar, it costs you some major money so why not make it do its job by having it in its proper place--in a slab the bottom 1/3 is prefered. There are plactic chairs that will clip over your rebar and hold them in place, they have a circular foot to give it surface to avoid it setteling down. Rebar can be tied together by the kids with a twisty tool and 6 inch twisty wires, not very costly at all. Now you get all the bang for the buck. If you use the pull up the rod as you pour option, or random rocks to hold it up, a rebar to high (surfacing rebar) while pouring you have major problems when you sure as heck do not need them. If the rod are on top of the fill they are expensive and worthless.

We use no less than a 4000lb mix and many times use a reverse mix. (more sand less gravel), easy to get a good finish. We also use a roller bug that perhaps you can rent (PRICELESS), it rolls out and pushes the rock 1/2 - 1/4" towards the bottom---thus you have a top mix with no rocks to mess with you, and provides a super hard top surface that is easy to finish. Do not pour on a hot dry windy day as the top dries to fast. A cure and seal will help--extra expence probably not maybe worth it.

Fiber mesh is a secondary reinforcment - not primary, was never intended to do so. It is used mainly in our crew for the precast and thin over old cement pours. Not money waisted just not cost effective. We would rather spend that money on rebar issues.

This no doubt is extreem, Never can afford to do it right the first time, but can wish you had for the rest of your life. Actualy this is more of a labor issue that can be done by the home owner other than a little profesional help may be a good idea during the pour. Dave NE IA

[Log in to Reply]  [No Email]
John from NC

02-02-2006 07:37:11




Report to Moderator
 Re: O/T, Concrete slab in reply to N. TX Tim, 02-01-2006 20:43:49  
I have a concrete man that comes by with extra very often. Last Fri. he showed up with a load and I was not ready. I threw out some 2x4's in front of the shop and poured a 10x20 pad. The following monday he showed again. I had added to the shop and needed the concrete inside. The driver backed his truck onto the 4 inch pad in front of the shop 3 days after being poured. We are talking a big concrete truck with 3 yards in it. It did not break it at all, not even on the edge that tapered in the front. This was 3500 psi with the fiberglass. It was poured on a un-pepared sand base. I was amazed. My opinion is buy the best concrete and you will not have problems. I have poured 4 big pads in the last few months and I haven't had any cracks yet.

[Log in to Reply]  [No Email]
RickL

02-02-2006 05:50:28




Report to Moderator
 Re: O/T, Concrete slab in reply to N. TX Tim, 02-01-2006 20:43:49  
the only thing that I would pour that thickness period would be sidewalks. 6inch minimum with rebar makiing squares every 16 inches layed down on anything to hold it up bricks rocks etc to make sure it is in the center of cement. Forget the fiber stuff that always worked to the top and you have thes sharp hairs every where. My footoings are always at least 31/2ft always preferr full4ft. Be sure put vapor barrier down also. THE MOST IMPORATNT IS THE BASE PACK,PACK PACK

[Log in to Reply]  [No Email]
loko17

02-02-2006 05:04:54




Report to Moderator
 Re: O/T, Concrete slab in reply to N. TX Tim, 02-01-2006 20:43:49  
Back in 1988, I had a floor poured in a 30' X 55' Morton building. The work was done by a group of local fellows that had a good reputation in doing this type of work. We poured 6" of concrete with fiber glass added but used no rebar or wire mesh. The floor was poured over a compacted bed of 1 1/2" stone. A trench about 2' wide and about 8" deep was dug down the center of the floor to form a monolithic beam and the concrete was poured in one shot with no expansion joints, just one big slab of concrete. I have had heavy machinery, a motor home, and numerous tractors in the building over the years and to this day still waiting to see my first crack. (I wish the builder who did my house had used these same guys for the concrete work because there with rebar, expansion joints, etc. I do have cracks.)

[Log in to Reply]  [No Email]
North of Linoma Beach

02-02-2006 07:10:46




Report to Moderator
 Re: O/T, Concrete slab in reply to loko17, 02-02-2006 05:04:54  
I feel the same way, my Morton Building is 2 years old, with a 5 inch floor using 3/4 inch rebar, and I have only one or two hairline cracks. My house is a year old and the exposed carport has several long cracks running in every direction. The only good thing is that the rest of the slab is covered with tile, wood, and carpet, so I cannot see what is going on, and there are no cracks in the walls to show any signs of settling or shifting.

[Log in to Reply]  [No Email]
BBx

02-02-2006 04:31:06




Report to Moderator
 Re: O/T, Concrete slab in reply to N. TX Tim, 02-01-2006 20:43:49  
I am in N TX also. I built a 30'x40' metal building 6 yrs ago. But my main support columns rest directly on the slab with anchor bolts deep in the concrete. I hired a local concrete guy with a good reputation. I told him I wanted a slab that would not crack. The slab is 4", maybe a little more. I don't remember the exact spacing of the rebar, but it was closer than 2'. I am thinking it was more like 18" or less. He dug healthy trenches around the perimeter for footers. He also dug the same trenches side to side and front to back thru the center. 3/8 rebar in the slab, 1/2" rebar in the trenches. He used 39 yards of concrete. After 6 yrs, there are only a very few small cracks of no concern.

[Log in to Reply]  [No Email]
mjbrown

02-02-2006 04:09:15




Report to Moderator
 Re: O/T, Concrete slab in reply to N. TX Tim, 02-01-2006 20:43:49  
Add fiber to your concrete. Small extra cost but well worth it in added strength. IMHO.



[Log in to Reply]  [No Email]
Ken Crisman

02-01-2006 23:31:06




Report to Moderator
 Re: O/T, Concrete slab in reply to N. TX Tim, 02-01-2006 20:43:49  
Not a trying to be a know it all ; but I think I'd not chance any cracking by pouring it at least 5" with that rebar . When my floor was poured by an expert , he guaranteed me that 5" without rebar would be suffiecent . Said I'd have no cracks . Well guess what . I have a crack at both door openings that go directly center to my floor drains . If I had to do over I'd have used rebar or the membrane in the cement . Even my 8" cement walls have 2 cracks in it at one corner . Good luck . Ken

[Log in to Reply]  [No Email]
Jim Williamson

02-01-2006 21:05:27




Report to Moderator
 Re: O/T, Concrete slab in reply to N. TX Tim, 02-01-2006 20:43:49  
Tim, 2x2 spacing for rebar is about standard. Use the heavier pieces in areas that will need it. Also where the doors are and sun shines in it will heat the concrete more than where it is shady and the concrete will want to crack there so put some extra steel there. It is customary to put some control joint in not more than 20x20 sq. either cut after, I recommend this way because you can fill the cut with silcone after to stop any spillage of fluids from getting in) or cut with tool when placing the cement. at the doorways dig the base down to 6" min for cement and put a 5/8 bar there one foot inside past the width of the opening (it will want to crack at the door edge)
I have had quite a lot of experience with concrete Good Luck Jim W

[Log in to Reply]  [No Email]
Ken Macfarlane

02-02-2006 06:52:17




Report to Moderator
 Re: O/T, Concrete slab in reply to Jim Williamson, 02-01-2006 21:05:27  
Concrete shinks when it cures so you get cracks. All the fiber and rebar or mesh do is hold it together so the cracks stay tight.

If you get over 16ft in any dimension you are basically doomed to have a crack with unreinforced concrete.

You can sawcut to make the crack look pretty but it is still a crack!



[Log in to Reply]  [No Email]
david - OR

02-02-2006 07:57:33




Report to Moderator
 Re: O/T, Concrete slab in reply to Ken Macfarlane, 02-02-2006 06:52:17  
I'm with Ken. As they say, there are two properties of concrete; 1) It gets hard. 2) It cracks.

Concrete shrinks as it cures. Rebar or mesh or fiber keep the inevitable cracks from growing apart, and generally keep the separe pieces of slab in the same plane.

Look at the floor of any big box store. You will see crack control joints on 10 foot centers in each direction. This allows the shrinkage stress to be relieved in a controlled, aesthetic way. That is what you should use in your shop. The crack control joints can be tooled into the concrete during finishing, or sawn once it sets up. There is also a finishing accessory called a "quick strip" or some such you can buy. It is basically a metal "tee" you can embed in the concrete during placement, that forms a crack control joint along its length. Try to avoid a floor plan with "re-entrant corners". Anywhere that there is a notch or 90 degree "inside" corner you have a stress concentration that tends to crack, despite crack control joints and reinforcement.

3/8 rebar on 18 inch centers is a pretty good recipe. Use plastic rebar chairs or concrete dobies to hold them up. Don't use chunks of brick -- the clay brick soaks up water and weakens the concrete around the brick. The rebar is superior to mesh because the placement crew can step between the squares and keep the rebar in the center of the slab. With mesh, the crew stomps the mesh to the bottom of the slab, and it has to be pulled up with hooks, which usually doesn't work, leaving the mesh near useless at the bottom.

Use a 6 sack mix, and use as little water as possible. Add a mid-range water reducer or super-plasticizer to the mix to increase slump and improve workability. Keep the truck driver away from his water hose. A low water/cement ratio will have less tendency towards slab curl and plastic shrinkage cracking.

[Log in to Reply]  [No Email]
[Options]  [Printer Friendly]  [Posting Help]  [Return to Forum]   [Log in to Reply]

Hop to:


TRACTOR PARTS TRACTOR MANUALS
We sell tractor parts!  We have the parts you need to repair your tractor - the right parts. Our low prices and years of research make us your best choice when you need parts. Shop Online Today. [ About Us ]

Home  |  Forums


Copyright © 1997-2023 Yesterday's Tractor Co.

All Rights Reserved. Reproduction of any part of this website, including design and content, without written permission is strictly prohibited. Trade Marks and Trade Names contained and used in this Website are those of others, and are used in this Website in a descriptive sense to refer to the products of others. Use of this Web site constitutes acceptance of our User Agreement and Privacy Policy

TRADEMARK DISCLAIMER: Tradenames and Trademarks referred to within Yesterday's Tractor Co. products and within the Yesterday's Tractor Co. websites are the property of their respective trademark holders. None of these trademark holders are affiliated with Yesterday's Tractor Co., our products, or our website nor are we sponsored by them. John Deere and its logos are the registered trademarks of the John Deere Corporation. Agco, Agco Allis, White, Massey Ferguson and their logos are the registered trademarks of AGCO Corporation. Case, Case-IH, Farmall, International Harvester, New Holland and their logos are registered trademarks of CNH Global N.V.

Yesterday's Tractors - Antique Tractor Headquarters

Website Accessibility Policy