Extract of an email I sent to a fellow Oliver :) fan. PS - if you use the email delete the word (remove). Lessons Learned or Work Shop Considerations As to the shop I would strongly recommend steel vs. pole barn etc. Make sure to pre-drill wall sheets before ASSY!! Also run a stringline down the ridge cap to maintain a straight screw line. This is by no means all the considerations but enough to ignite some other thoughts. Email me and I can provide an Excel residential home construction checklist/loan calculator for other thoughts and a comprehensive builder's checklist. Planning I put up a straight wall steel bldg. from Millennium Steel with full fiber and rebar reinforced concrete slab (~14K bldg & slab only). Walls are 24ga & roof is 26ga. Screwed up & did not add insulation - so far no issue but told it will be in the future. I would spend the extra and get the insulation. I would NOT recommend Millennium Steel. Plans are vague and you must hand assemble every single component. Consider some else such as Mueller, Steel Building Systems (Adel, GA) or others (Morton $$$$). The uprights are pre-welded so all you have is an adult sized erector set. Bldg is 30w x 60L x 14h enclosed. I added a 10' slab extension at the rear for fuel storage. Still haven�t added a lean to of the east side for parking my equipment on dirt floor nor covered the fuel storage area. I looked at pole bldgs. & cost was nearly the same as steel. Also much less maintenance in FL with steel (termites etc.). Also with steel you can get a bigger �clear span� than with wood. Code here requires 120MPH wind load (hurricane) on structure and doors. I did not like Quonset style due to lost storage space because of the wall construction - ridges and lost storage space due the arch vs. straight walls. The ridges were throughout the entire structure, and I thought it would be a hassle when wiring, plumbing, adding workbenches etc. I also wish I would have built mine on a 3 or 4 ft. stem wall. I could have gone to a taller building with no more expense from the supplier and reduce the need for special equipment to move longer sheets of metal. It also permits installation of a taller door at less cost and the stem walls provide protection of the door from the trailer being backed in or an implement. If no stem wall consider PVC filled bollards at the door entrances. I have no windows just big doors opposite ends of the shop for cross-ventilation. One personnel door and NO SKY LIGHTS!! Everyone I spoke with says they wish they had not put them in. They last about 5 yrs. and then nothing but HEADACHES. My recommendation is to steer clear. You should plan on needing approx. 4� around a rig to work on it -16ft., so that leaves 3ft for work bench and tools on one side and maybe one end, so you will be left with an area of 16 x 20 for unit- 16 x 23 if leave end bare. Be sure to allow room for tools- welders, chop saw/band saw, drill press, lathe, air compressor Hoping to add a loft or mezzanine this summer for overhead storage and wall off an office area for sippin� fine bourbon & a bathroom in the back corner with deep sink and toilet. Heating will be an individual thing, mine is unheated but I live in SUNNY FL :) I would also consider some overhead plumbing for shop air besides outlets along the wall. Then you can install a retractable hose line and not have the hoses all over the shop floor. Gutters are optional. Here is a link for some on-line plans if you need some other ideas. http://www.ag.ndsu.nodak.edu/abeng/plans/ Flooring I debated on the gravel for some time. I decided on full concrete for the following reasons: #1 - Once done it's done! b) Two pours more expensive c) Two pours more effort to get & keep level & get the truck's chute far enough inside to reach new pour location. d) Work on my own rigs, creeper won't roll on rock Less time to clean, hose down and squeegee, plus less moisture inside the building thereby reducing other misc. maintenance e) Gravel will be outside for outdoor equipment storage but not inside. Hindsight is 20/20 so also consider some buried anchors or chain to use to pull against to straighten parts. Also think about 2� or 3� embedded pipe stands for grinders, etc. Concrete drive-in ramps are next addition to my shop so I can clean rigs outside then drive in. Not to fun having to always clean up shop floor from grungy rig or implement. I also poured a 10' concrete extension in the rear for future use - fuel storage and (Jim Beam & my easy chair?). I also put in a floor drain with a 6� drainpipe under the slab out to the rear of the shop. Concrete guy did a pi$$ poor job with this during the pour. The drain floated up some as did the pipe. A current consideration for me is install a drain grate down the center in at least 2/3 of the shop to wash-down whatever. This would be connected to a drain line into the swale below and behind the shop. Lighting For my shop 30W x 60L x 14H here is what I am currently doing. I have brought 200amp service to the shop in 42-circuit panel. Bigger panel was selected for expansion if ever needed (bought it from electrical contractor during house construction). I am wiring lighting outlets every 10 ft. on center set out from the wall about 6 ft. I have also have one overhead outlet for every 100 sq ft. (ceiling fan or drop cord). I am using 4 bulb fluorescent fixtures I scrounged from the dump. For each row of lights I am installing 3-way switch switches at each entrance to prevent back tracking and improve efficiency. For bench work I am installing 2 outlets with a wall control switch. Right now the bench lighting will be incandescent with hopes to replace this with 150W reflector bulbs later. These lights will be about 4 ft. above the bench. Outside lighting is mercury vapor with dusk-dawn controls (Lowes Store) on front and back entrances. One day the sides will be covered with motion sensor flood lights (Lowes store) to come on when parking equipment and to be a deterrent. General use outlets are 20amp duplex spaced every 4 ft. of wall space (overkill for sure). In case I reconfigure things (move the barley pop machine or toaster oven) I don't want to run out of outlets. I have one GFCI outlet for each wall. I have also dedicated one outlet for each tool less than 1/2 hp. Special purpose outlets are planned (but not yet installed) for tools 1/2 hp or bigger. Both the general use and special purpose outlets will be on branch circuits to serve no more than three 1/3 hp motors, two 1/2 hp motor or 1hp or bigger. I also have plans for four 50 amp 2 wire with ground outlets for my ancient DC welder (Lincoln DC 250-MK Aircraft) and my air compressor. One of the welder outlets is going to be placed just inside the main roll up door so I can repair equipment outside without having to remove implements etc. Heating is really not a concern in my area (N. FL) as it does not get bone chilling cold here but the overhead outlets will provide ceiling fan cooling in the warmer months. One thing I rarely see mentioned is painting for reflectance. When done my shop walls will be painted with a light matte off-white color and ceiling will be painted ceiling white. This should improve lighting efficiency. This is something that can be done by all of us and cost is just paint and some elbow grease. No code constraints that I am aware of :) When I am done it should be rather nice place to work. This project has been a work in progress for nearly 2 yrs. I am now about 2/3 complete. The above is my PLAN so when finished I do not have to come back and rewire, add etc. Once it is done it is DONE (or so I hope). Wiring To save myself time and ensure safety I obtained one of these manuals - http://www.nfec.org/electricalwiring.htm As copied from the website; "To avoid Code violations the Agricultural Wiring Handbook offers help. The newly released 13th edition provides wiring information for swine buildings, dairy and beef operations, poultry facilities, as well as farm shops, machinery sheds and grain facilities. Contained in 34 separate chapters, the 100-page Handbook also covers farmstead distribution topics, three-phase wiring, grounding and lightning protection, motor circuit requirements and newly-updated wire sizing tables." Perhaps one can be found at your local Extension office or Ebay. Also installed some speakers so I can listen to the NASCAR race, talk radio or some music. I would suggest putting in a phone line and ringer next to the barley pop machine. Also make sure phone line has extra pairs so you provide an Internet outlet for the YTMAG session during quiet time with a barley pop :) Believe you me, those wireless phones DO NOT work worth a hoot inside my metal structure. Shop Air I hope to plumb the shop with air with outlets near each electrical outlet. Plumbing will include an overhead line with retractable hose reel to prevent having lines all over the shop floor which can be a PITA (ex-aviation jobs taught me that). Overhead Dolly/Jib Crane My shop will not permit this but it sure would be nice. Currently using a cherry picker for engine work. Hope this helps some PSS - fotki has blocked my account. I will get it reactivated soon so you can see some old pics of the original construction efforts.
|