|
Indydirtfarmer
09-18-2003 04:19:18
|
|
Re: Just poured concrete--some questions in reply to Travis, 09-17-2003 20:31:11
|
|
| |
Kurt's suggestion about "watering the concrete has good merrit. Concrete gets stronger if it dries slower. It also has to cool to dry strong. The chemical reaction between the lime and the water in concrete mix, generates tremendous heat. When the Hoover dam was built, they installed water pipes in the concrete, to pump cold water through, to cool it, so it would dry all the way through. If you have ever noticed on highway construction, that they cover the freshly poured concrete with canvas. That is to make it dry slower, and more evenly. I am not sure of the time-line, but concrete take years to reach it's maximum hardness. It does, however, reach approximately 90% hardness, in a matter of a few days. The saw-cuts Kurt was referring to, won't actually "prevent" the concrete from cracking. They are called "control joints" or "control cuts". They make it crack in a straight and controlled line, rather than just breaking wherever it wants to. Any slab of concrete, that is very big, will crack eventually. The control joints just let you dictate where it does crack. If you do cut control joints, they don't have to be all the way through the slab. Usually a cut that is 20% to 25% of the way through, will be sufficient.
|
|
|