I sent you an email with instructions, but I am not sure my email was successful. So here it is again just in case. "Z" SPLIT OF THE SUPER 55The easiest way to gain access to the engine clutch and power take-off clutch assemblies on Super 55 Series tractors is to "Z" split the tractor. Equipment needed to do this includes a hydraulic floor jack to support the rear half of the tractor and solid blocking to support the engine and front frame assembly. DISASSEMBLY 1. Block up the engine and front main frame assembly just ahead of the joint made by the front main frame and the center frame. This blocking should be sufficient to just support the weight of the front main frame assembly and keep it level. 2. Push the hydraulic jack under the tractor from the rear so that the lift makes contact with the rear main frame solidly just to the rear of the joint made by the center frame and rear main frame. Raise the lift so that it just supports the weight of the rear main frame assembly. 3. Disconnect the fuse block to fender light wire from the fuse block under the panel. 4. Disconnect the stay rods from the front axle center member, leaving the stay rods connected to the right and left sides of the center frame. 5. Remove the cap screws and washers that fasten the center frame cove to the center frame and the rear main frame. 6. Remove fastening screws and clutch dust cover from bottom of center and front frames. On Super 55 tractors built prior to 22 841-500 and all 550 tractors, it is only necessary to disconnect the dust shield under the front and center frames from the center frame by removing the two rear cap screws. 7. Remove the 5/8 inch cap screws and lock washers that fasten the center frame to the front main frame. 8. Separate the engine and front main frame from the center and rear main frame assembly by carefully pulling the hydraulic jack and rear half of the tractor out from under and away from the center frames cover and front main frame. Take care that the jack does not drop and bent the clutch shaft. g
|