|
I am in the processing of building a riding ring here in NH on a hillside of clay, rocks, boulders. After clearing the trees and stumps I rented a D5C dozer for a day ($350/day + $60 delivery) and hacked out a fairly level spot from the hillside where the high side was about 8 feet higher than the low side over 100 feet. I'll be using my 8N to finish leveling it up and then we're bringing in the cheapest sand we can find which we expect will disappear into the clay. We'll then repeat as necessary and hopefully end up with a fairly reasonable surface. I've got a backblade and 3-pt scoop for my 8N. For finishing this project up I'm wishing I also had a box blade for moving dirt better and a landscape rake to ease the agony of all these damn rocks. And while I'm dreaming, maybe another N too. I don't think I'd use the gravel, but I'd stick with the sand. It may disappear over time into that deep top soil and you'll need to reapply. Your situtation sounds like an N can do it given the time. Not that I'm envious or anything. No, no, nothing like that. Jerry (The bulldozer was fun though!)
|