|
2600 hours is quite reasonable for a machine. 8000 hours would be a more likely time for rebuilding. Pine stumps would be much easier to get out, and being that there are only 3 feet of roots, I would think that your project is possible? My favorite way to push trees (whole tree) is to raise the front bucket to about 9' and get a 8' running start at the tree. Back up, lower bucket to 5' push again, (hopefully the roots are sticking up by now) and get the blade under the roots and heave it out. Works with my 780, anyhow. 2 WD is good for getting out of a muddy spot, but is not completely necessary. Chains are only needed if you are pig headed and just absolutely have to push trees the next day after a rain. If it is too cold for starting fluid, it is too frozen to push trees. No matter how you cut it, three acres is a lot of trees for a backhoe. It is pushing any backhoe to the outter limits. It is nearly a job for a trackhoe. Personally I beleive you may have to dig all the way around each stump to get them out. Don't have ledge here in MD (assume you are in MA) so I can't tell if that is for you or against.
|