You guys know the type, they need to sweep a 10 x 12 floor.
They have three hours to get the job done.
So they grab the broom with every intention of getting the job done.
But everything is Uber complicated for these people, so they spend
the next couple of hours talking about what would be the best way
to utilize the broom they are holding to accomplish the job.
Even though this is just a rectangular floor with no obstacles, there
may be one method of attack that would be better than another.
If I sweep crosswise, it may leave streaks.
If I sweep lengthwise, I may stir up too much dust.
At the end of the three hour allotted time, they have decided the best
thing to do is to hold a meeting with all of the floor sweepers to
determine the best way to get the floor clean.
So a one hour meeting is scheduled for early next week, then has
to be rescheduled because the lead sweeper had a scheduling
conflict and couldn't make that meeting.
So late next week, the meeting runs over time and takes 3 hours
instead of one an at the end of that three hours, absolutely
NOTHING has been accomplished except a lot of yakking.
I can't be the only one that would rather just sweep the dam floor am I?
They have three hours to get the job done.
So they grab the broom with every intention of getting the job done.
But everything is Uber complicated for these people, so they spend
the next couple of hours talking about what would be the best way
to utilize the broom they are holding to accomplish the job.
Even though this is just a rectangular floor with no obstacles, there
may be one method of attack that would be better than another.
If I sweep crosswise, it may leave streaks.
If I sweep lengthwise, I may stir up too much dust.
At the end of the three hour allotted time, they have decided the best
thing to do is to hold a meeting with all of the floor sweepers to
determine the best way to get the floor clean.
So a one hour meeting is scheduled for early next week, then has
to be rescheduled because the lead sweeper had a scheduling
conflict and couldn't make that meeting.
So late next week, the meeting runs over time and takes 3 hours
instead of one an at the end of that three hours, absolutely
NOTHING has been accomplished except a lot of yakking.
I can't be the only one that would rather just sweep the dam floor am I?