omahagreg
Well-known Member
Was assigned this short wall this morning! By 10:30 I had it framed. Note the pipe on the left-I installed a 1" pipe flange in the track, then threaded in the 1" x 30" pipe so I can give the unsupported end some hidden strength! After the pipe is in, I plumb the wall and install another cripple stud which gets screwed to the pipe. Pictures are from my phone, sorry for the glare!
By 12:30 I had it rocked, beaded, and first coat of mud
By 3:30 I had a second coat of mud drying over the weekend! This will get a 10" wide laminated top when it is all done.
By 12:30 I had it rocked, beaded, and first coat of mud
By 3:30 I had a second coat of mud drying over the weekend! This will get a 10" wide laminated top when it is all done.