Have overhauled the top cover, new cross shaft, rebuilt the lift cylinder, now at rig stage to check / adjust all the linkages. Most have not been disturbed, but I want to be sure everything is good when I put the cover back on. The book shows 3 tools needed, I have Googled, phoned several NH dealers, but no luck with 2 of the tools, which are unique to the Load Monitor equipped tractors. If anyone can help me find these, either to buy, or get dimensions to make copies, I would really appreciate it. Thanks.
First tool is SW-862-A, Ford tool number 1323, Alternate tool number SW25. This clamps to the corner of the top cover, and registers the strut position. See pictures below.
The second tool is SW862-B, Ford tool number 1324, alternate tool number SW26. This is an "L" shaped tool to register the control rod and roller. See pictures below.
First tool is SW-862-A, Ford tool number 1323, Alternate tool number SW25. This clamps to the corner of the top cover, and registers the strut position. See pictures below.
The second tool is SW862-B, Ford tool number 1324, alternate tool number SW26. This is an "L" shaped tool to register the control rod and roller. See pictures below.