I'm picking up a box scraper on Thursday to (hopefully) smooth out the driveway/garage apron.
I've been having a ball plowing snow with the front blade... but in the meantime I've also scrapped quite a bit of the gravel drive into the snow piles... gonna need to reposition the gravel and get a crown on the drive... I'm gonna have a shallow ditch on each side of the drive.
Here's a rough sketch of what I have to work on (arrows show the direction the water needs to flow)... the drive being about 1/4 mile long and running gently downhill.
I need to get the barn and garage to drain downhill (along with the short section of drive between them) then get the road to drain to each side. Right now I have relatively flat spots where water pools in front of the barn and also on the road.
The crown of the road seems simple enough (tilt the blade to get the gravel back to the center then flatten the top of the crown?)...
It's the barn/garage part I'm not so sure of... do I run the tractor west/east to bring some material back towards the garage then go east/west to smooth it out?
The short section of drive between the barn and the garage... same thing?
Any input from those who've done something similar in the past?
I've been having a ball plowing snow with the front blade... but in the meantime I've also scrapped quite a bit of the gravel drive into the snow piles... gonna need to reposition the gravel and get a crown on the drive... I'm gonna have a shallow ditch on each side of the drive.
Here's a rough sketch of what I have to work on (arrows show the direction the water needs to flow)... the drive being about 1/4 mile long and running gently downhill.
I need to get the barn and garage to drain downhill (along with the short section of drive between them) then get the road to drain to each side. Right now I have relatively flat spots where water pools in front of the barn and also on the road.
The crown of the road seems simple enough (tilt the blade to get the gravel back to the center then flatten the top of the crown?)...
It's the barn/garage part I'm not so sure of... do I run the tractor west/east to bring some material back towards the garage then go east/west to smooth it out?
The short section of drive between the barn and the garage... same thing?
Any input from those who've done something similar in the past?