Question for the brain trust:
Had a slab poured this week and want to
start framing. The contractor set a couple
of j bolts in the wrong location.
I plan to cut them off and drill for quick
bolts after the he wall is up. Just
wondering how long I should wait. This is
for anchoring the bottom plate around the
perimeter of the slab. I have a good Hilti
hammer drill.
Any concrete men here?
Thanks.