Jake Collie
Member
I have the IT manual and am waiting for the operator manual I bought from this site but hopefully someone can answer this before the manual gets here.I have a joystick loader diretional control valve rated for 10 GPM and 4000 psi. From what I understand, when installing a power beyond valve it has priority over the rest of the system. I am guessing this open centered valve must be capable of passing full flow hydraulic fluid when not in use. I am also guessing 10 GPM is not large enough. What would be the minimum GPM needed for a power beyond loader valve for a 1850? Thanks.