touringsedan
Member
I guess this gets us all. The head gasket went bad, followed by antifreeze in the oil destroying the bearings. Crank was turned, Block was bored and .090th sleeves installed, new pistons, new valves, springs, guides, cam and lifters. Block decked along with the head. ( valve to piston clearance checked) You get the idea $2200.00 and the engine is like new again.
So why not rebuild the steering box, Hydraulic pump, go thru the tranny. I am going to seal off the front side and then go thru the center section. This was going to be a " honey I can just fix the engine and put it back to work deal " I am having fun though..
So why not rebuild the steering box, Hydraulic pump, go thru the tranny. I am going to seal off the front side and then go thru the center section. This was going to be a " honey I can just fix the engine and put it back to work deal " I am having fun though..