[b:5a79441497][i:5a79441497]Good morning..ALL.
Things have slowed to almost stop, due to the lumber yard being closed for the week end, and not being able to find a brace for the frame extention, as DELL mentioned in his prev. reply. I about croaked, when I found out how much a 2ft. piece of the 4" tubing would cost, so....I'm out scouting the area for a used piece that will fit. Or I may have to use angle iron in it's place, doubled up.
The hubs got cleaned up, primered, and newbearings, then painted, and installed. The frame is all primered,and painted. As soon as the lumber yard opens tomorrow, I can renew my work as far as cutting the floor to fit, and continue to look for a suitable brace.
Then I may get something done on the tote, so as to getting closer to being finished.
Here are a couple of "update pix for ya.
Feeling like not much accomplished!!!
Have an "N" Day.
Gary
[/i:5a79441497][/b:5a79441497]
Things have slowed to almost stop, due to the lumber yard being closed for the week end, and not being able to find a brace for the frame extention, as DELL mentioned in his prev. reply. I about croaked, when I found out how much a 2ft. piece of the 4" tubing would cost, so....I'm out scouting the area for a used piece that will fit. Or I may have to use angle iron in it's place, doubled up.
The hubs got cleaned up, primered, and newbearings, then painted, and installed. The frame is all primered,and painted. As soon as the lumber yard opens tomorrow, I can renew my work as far as cutting the floor to fit, and continue to look for a suitable brace.
Then I may get something done on the tote, so as to getting closer to being finished.
Here are a couple of "update pix for ya.
Feeling like not much accomplished!!!
Have an "N" Day.
Gary