MF1100 3pt Lower Link Arm Removal

Hi, while moving bales the link adjustment threads stripped on one of my 3 pt lower link vertical arms. Does anyone know how to remove the vertical link arm from the horizontal lift arm? It appears the only option is to punch out the hinge bolts but that seems to be no easy task. I will try to upload a picture to help explain the problem.
 
36857.jpg
 
Old parts book shows you need the complete rockshaft arm assembly if I remember right. Knuckle parts are not shown separately. Standard shaft is 1 1/8 inch, assembly part # 509 711 M94. Heavy duty is 1 3/8 inch shaft, part # 508 393 M94..
 
Hi, I would agree with Dieseltech. You will need the complete upper rod and stud arm as one assembly on the numbers
quoted. It looks like you have the heavy duty version. You will need to check the condition of the thread in the
fork as that may be damaged or badly worn and may wreck the new rod.

DavidP, South Wales
 
I am not much help (At least my memory isn't) but we broke ours too, by coincidence the same side lift rod as yours. They were virtually unobtainable here in The UK but after lots of phone calls we found that MF in Manchester had just ONE left in stock, however it was the right hand one i.e. the one with the leveling lever, so we ordered it and indeed we fitted it! but I just can't remember how we did it (Sorry) but I well remember it did look strange have a leveling lever on both sides of the linkage.
 

We sell tractor parts! We have the parts you need to repair your tractor - the right parts. Our low prices and years of research make us your best choice when you need parts. Shop Online Today.

Back
Top