I have three 4"OD pipes that are 80" long. They are Schedule 40 and made of metal. I also have some 2" angle iron and a piece of 5' long 3" channel that I may be able to use. I normally drag one length of pipe behind the disc, but it just doesn't get the results I want. I filled it with concrete to weight it down, but it just isn't enough.
So I'd like to build a frame and use all three pipes. Should I make the pipes drag at an angle? How much space should there be between them? Should I make the ground engaging part of the drag out of angle and let the pipes be the "weight" part?
I want this drag to be hooked to the drawbar. I have a box blade and a scraper blade and neither will do what I want to do in this application... Let me hear your opinions.
So I'd like to build a frame and use all three pipes. Should I make the pipes drag at an angle? How much space should there be between them? Should I make the ground engaging part of the drag out of angle and let the pipes be the "weight" part?
I want this drag to be hooked to the drawbar. I have a box blade and a scraper blade and neither will do what I want to do in this application... Let me hear your opinions.